Plumbing Renovation
NYC Department of Transportation
Modernized plumbing systems with water-saving fixtures
Project Overview
This comprehensive renovation project for the NYC Department of Transportation's garage facility involved modernizing outdated plumbing systems with water-efficient fixtures and infrastructure. The project aimed to reduce water consumption, improve operational efficiency, and ensure compliance with the latest NYC building codes and sustainability standards.
Project Value
$1.2 Million
Duration
3 months
Efficiency Improvement
32% reduction in water usage
Compliance
Meets NYC Local Law 152 and DOB requirements
Scope of Work
- Complete replacement of outdated plumbing fixtures with water-efficient models
- Installation of new copper piping throughout the facility
- Implementation of smart water management systems for usage monitoring
- Upgrade of drainage systems to improve flow and prevent backups
- Installation of water-saving technologies in all restrooms and utility areas
- Comprehensive testing and certification of all installed systems
Project Timeline
Initial Assessment
Comprehensive evaluation of existing plumbing systems and infrastructure needs.
Design & Planning
Development of detailed renovation plans and procurement of materials.
Implementation
Installation of new fixtures, piping systems, and water-saving technologies.
Testing & Handover
Rigorous testing, final inspections, and project completion.
Challenges & Solutions
Working in an Active Facility
The DOT garage needed to remain operational throughout the renovation, presenting significant logistical challenges.
Our Solution:
We implemented a phased approach, working in sections during off-peak hours and weekends. Our team coordinated closely with facility management to ensure minimal disruption to daily operations while maintaining the highest safety standards.
Aging Infrastructure Complications
The existing plumbing system was significantly outdated, with undocumented modifications and unexpected layout issues.
Our Solution:
Our experienced team conducted thorough preliminary investigations and created detailed as-built drawings before beginning work. We maintained flexibility in our approach, quickly adapting to unforeseen conditions while keeping the project on schedule.
Project Gallery

Original plumbing infrastructure before renovation

Installation of new water-efficient fixtures

Completed renovation with modern plumbing systems
Client Testimonial
HEPCO's team demonstrated exceptional professionalism throughout the renovation project. They navigated the challenges of working in our active facility with minimal disruption, and the water savings we've achieved have exceeded our expectations. The project was completed on time and within budget.
Michael Rodriguez
Facilities Manager, NYC Department of Transportation
Key Results
Reduction in water usage
Annual utility cost savings
Code compliance achieved
Additional Outcomes:
- Improved water pressure and system reliability throughout the facility
- Enhanced maintenance accessibility for future servicing
- Comprehensive documentation and training for facility staff
- Project completed on schedule and within budget constraints
Technical Specifications
Component | Specification |
---|---|
Fixture Type | Low-flow water fixtures |
Piping Material | Copper with lead-free solder |
Control Systems | Smart water management system |
Compliance | NYC Plumbing Code & Green Building Standards |
Related Projects

NYS Office of General Services
Gas Line Install
Installed high-capacity gas lines and regulators to convert three boilers to natural gas at the Manhattan Psychiatric Center. Completed during full facility operation with no downtime.
Learn more

Jump Trading
Booster Pump Install
Installed booster pumps to support critical cooling infrastructure for data center operations.
Learn more

Mattress Firm
Gas Line Install
Emergency replacement of leaking gas lines with minimal disruption to store operations.
Learn more