Project Details
Client
Jump Trading
Value
$450,000
Timeline
6 weeks
Completion
October 2022
Location
New York City
Team Size
3 specialists
Scope of Work
The booster pump installation for Jump Trading's data center was a critical project requiring precision engineering and zero-downtime implementation. The facility's cooling infrastructure demanded enhanced water pressure and flow rates to maintain optimal operating temperatures for their sensitive computing equipment.
Our team designed a custom solution featuring redundant booster pumps with variable frequency drives to provide consistent pressure regardless of demand fluctuations. The installation required careful integration with existing building management systems and power infrastructure.
Working within the constraints of an active data center environment, we implemented the installation in carefully planned phases, with temporary systems in place to ensure continuous cooling throughout the process. Our technicians worked during scheduled maintenance windows to minimize any potential impact on operations.
The completed system includes advanced monitoring capabilities, allowing facility managers to track performance metrics in real-time and receive alerts about any potential issues before they affect operations. This proactive approach has significantly improved system reliability and reduced the risk of costly downtime.