The Short Answer
- 01Due December 31, 2026: community districts 4, 6, 8, 9, and 16 in every borough.
- 02Due December 31, 2027: community districts 11, 12, 14, 15, and 17.
- 03The schedule repeats every four years: districts 1, 3, and 10 are due again in 2028.
- 04The owner files the GPS2 certification with DOB within 60 days of the inspection. File later and the building needs a new inspection.
- 05Not filing costs $5,000 ($1,500 for a three-family building).
In This Guide
01
LL152 Schedule by Community District
The Department of Buildings splits the city's community districts into four groups. Each group gets one calendar year out of every four, and the inspection can happen any time between January 1 and December 31 of that year. The district numbers apply in every borough, so Queens Community District 4 and Brooklyn Community District 4 share a deadline.
- 1, 3, 10
- Cycle 22024
- Cycle 32028
- Cycle 42032
- 2, 5, 7, 13, 18
- Cycle 22025
- Cycle 32029
- Cycle 42033
- 4, 6, 8, 9, 16
- Cycle 22026Due now
- Cycle 32030
- Cycle 42034
- 11, 12, 14, 15, 17
- Cycle 22027
- Cycle 32031
- Cycle 42035
Buildings that received a certificate of occupancy on or after December 6, 2016 have their first inspection in the tenth year after the CO, then join their district's cycle.
02
Check Your Building's Deadline
Enter the address below and we'll look up its community district and show the year it's due. You can also find the district on the Department of City Planning's community district profiles, which is where DOB sends owners.
See the full DOB schedule by community district
Every building is inspected once every four years, in the year set for its community district. Not sure of your district? Enter your address above.
| Community district | Inspection year | Next one |
|---|---|---|
| 1, 3, 10 | 2024 | 2028 |
| 2, 5, 7, 13, 18 | 2025 | 2029 |
| 4, 6, 8, 9, 16 | 2026Due now | 2030 |
| 11, 12, 14, 15, 17 | 2027 | 2031 |
03
What Has to Happen, and by When
The inspection is only the first step. These are the filing windows from 1 RCNY §103-10, counted from the inspection date unless noted.
- 1
Notify DOB 2 Days Ahead
Since 2026, the inspector must notify DOB at least two days before the inspection.
- 2
Inspection by December 31 of Your Year
A licensed master plumber, or a qualified inspector working for one, inspects exposed gas piping from the point of entry through the public spaces, hallways, corridors, and boiler and mechanical rooms.
- 3
GPS1 Report to the Owner Within 30 Days
The plumber gives the owner the inspection report and certification, listing any leaks, non-code-compliant or illegal connections, and worn parts.
- 4
GPS2 Certification to DOB Within 60 Days
The owner files the GPS2 with DOB within 60 days of the inspection. A GPS2 filed after that requires a new inspection.
- 5
Corrections Certified Within 120 Days
If the report lists conditions to fix, the plumber certifies the corrections within 120 days of the inspection, or within 180 days if the GPS2 says more time is needed.
04
What Changed in 2026
Amendments to the LL152 rule took effect January 3, 2026, and Local Law 142 of 2025 took effect February 22, 2026. The changes that matter to owners:
- Two-day notice: the inspector must notify DOB at least two days before each inspection.
- Stricter inspector qualifications: someone inspecting under a master plumber now needs a Journeyman Plumber registration plus DOB-accepted training of at least seven hours.
- Defined scope and equipment: the law spells out what the inspection covers and the leak detection instruments required.
- Buildings without gas service now need a utility statement every cycle, not just once.
- Buildings with no gas piping at all certify that only once, and the certification can now come from the utility.
- Violations: to resolve one, the owner has to pay the penalty and file the certification.
- Filing moves to DOB NOW: Safety, with new fees once it does.
- Inspection certification
- Fee$35
- Extension request
- Fee$35
- Certification of correction
- Fee$35
- Certification of no gas piping
- Fee$375
- Documentation of no gas service
- Fee$480
05
Penalties for Missing the Deadline
Failing to file an inspection certification carries a civil penalty of $5,000, or $1,500 for a three-family building (1 RCNY §103-10(f)). Some articles online quote $10,000; we couldn't find that number in the rule or on DOB's site.
The penalty doesn't replace the inspection. The building still needs it done and filed, and since 2026 the violation stays open until both the penalty is paid and the certification is filed. The rule allows penalty waivers in limited cases.
06
Which Buildings Are Exempt
Buildings in occupancy group R-3 (one- and two-family homes) are exempt. DOB also lists these Department of Finance building classes as exempt:
- A0–A9 (one-family homes) and V (vacant land)
- B1, B2, B3, and B9 (two-family homes)
- CM, N2, S0, S1, and S2
- M3 with two or fewer dwelling units, and M4 with 20 or fewer occupants
Three-family homes, apartment buildings, mixed-use, and commercial buildings are covered. A building with no gas service still has to file the utility statement each cycle.
07
What Happens if the Inspector Finds a Problem
Most findings are conditions to correct and certify within the 120-day window. In our inspections the common ones are capped "future use" connections, missing or broken meter bars, corrosion, missing pipe supports, unlabeled piping, and old unpermitted work.
Inspecting early in your year leaves time to fix findings before December 31 without rushing, and lets the repair and the correction filing go to the same licensed plumber. See our Local Law 152 inspection service.
08
Common Questions
Which buildings are due for Local Law 152 in 2026?
Buildings in community districts 4, 6, 8, 9, and 16, in all five boroughs. The deadline is December 31, 2026. Districts 11, 12, 14, 15, and 17 are due by December 31, 2027.
How long do I have to file the GPS2 after the inspection?
60 days from the inspection date. If the GPS2 is filed after that, DOB requires a new inspection. The plumber must give you the GPS1 report within 30 days of the inspection.
What is the penalty for not filing an LL152 inspection?
$5,000, or $1,500 for a three-family building, under 1 RCNY §103-10. The building still has to complete and file the inspection, and the violation stays open until both are done.
Can I get an extension on my LL152 deadline?
Yes, once. Owners can get a 180-day extension by notifying DOB and paying the fee.
Do one- and two-family homes need a Local Law 152 inspection?
No. Buildings in occupancy group R-3, which covers one- and two-family homes, are exempt. Three-family homes are covered.
Who can perform a Local Law 152 inspection?
A NYC licensed master plumber, or someone working under the master plumber's direct and continuing supervision who holds a Journeyman Plumber registration and has completed at least seven hours of DOB-accepted training.
Sources
- NYC DOB: Gas Piping Inspections (Local Law 152)
- 1 RCNY §103-10: Periodic Inspection of Gas Piping Systems
- NYC DOB Service Update: Local Law 152 Follow Up #7 (April 3, 2026)
- NYC Department of City Planning: Community District Profiles
This guide explains NYC rules in plain terms. It isn't legal advice, and rules and utility procedures change; check the sources above or call us about your building.